These are pictures of me operating the Yamaha QL1 sound desk for the sound check before show of Starlight Express. Over the show week I have been doing the SFX on an ACAI beatpad for the show as well as having a practice on the sound desk

Tuesday, 26 April 2016

26/04/2016 Setting up a projector.

Today we set up a projector in the ceiling of the Drama studio for a GCSE exam, we had to come up with an equipment list then go to the store cupboard and find the equipment that we would need to use. The equipment we needed was a projector, projector ceiling mount,VGA cable, power cable and the projector remote. We then went back to the drama studio and assembled the projector on the IWB which was going to be projected on the wall so we didn't need to assemble a screen as well.

Friday, 15 April 2016

15/04/2016 - recording soundscape audio and visual

Today we recorded some of the audio/ sound effects we need for are soundscape including slamming doors , creaky doors, horses galloping..etc. But we also video recorded all of this as evidence for our unit.

This picture is of me recording my voice onto Cubase. ^ Using a condensor mic setup.


This is a picture of me recording my footsteps with a portable recorder and a tripod. 
 This is my final Cubase project.
 This is showing me using automation to fade in the sound on Cubase.
This is showing me adding reverb to one of my recordings on Cubase.

Wednesday, 13 April 2016

13/04/16 - soundscape practice in a group

Today we (Me, Rowan,Charlie and Ashley) went out and recorded various sound effects we would need for our soundscapes on the schools Alesis portable recorder on a tripod such as falling onto a mat to re-create Mourise falling off his horse then slamming a door to get the door slamming effects and also got the bush rustling and twig snapping sfx recorded. We will be doing the real recording in our following lessons.

Friday, 18 March 2016

Keystoning a projector.

Today we learned how to set up a projector and to program through chamsys how to set it up as a video output we then learned how to keystone the projector so that it fit on the wall but also how to horizontally and vertically flip the image which would be useful if the projector was displaying rear projection however as it is in the image the projector is just normal front projection.

Friday, 11 March 2016

setting up video system Wednesday 9th March



Today we set up a live composite video feed from a CCTV camera through a BNC cable which then goes into an RCA adapter then into a 4 way splitter then continuing RCA into two different TV's.

Thursday, 3 March 2016

Setting up the the lighting for the fashion show.


Yesterday we set up the lighting plan for the fashion show that is part of Rowan and Conners exam for lighting, we firstly layed out all the lighting on the floor according to the lighting plan then assembled the tower. When the tower was assembled we started rigging all the lanterns on the IWB's to where they should be on the lighting plan but then left the focusing to do on Friday at period 3 when we are as a group again and have the hall more set up for the fashion show.