Tuesday, 26 April 2016

26/04/2016 Setting up a projector.

Today we set up a projector in the ceiling of the Drama studio for a GCSE exam, we had to come up with an equipment list then go to the store cupboard and find the equipment that we would need to use. The equipment we needed was a projector, projector ceiling mount,VGA cable, power cable and the projector remote. We then went back to the drama studio and assembled the projector on the IWB which was going to be projected on the wall so we didn't need to assemble a screen as well.

Friday, 15 April 2016

15/04/2016 - recording soundscape audio and visual

Today we recorded some of the audio/ sound effects we need for are soundscape including slamming doors , creaky doors, horses galloping..etc. But we also video recorded all of this as evidence for our unit.

This picture is of me recording my voice onto Cubase. ^ Using a condensor mic setup.


This is a picture of me recording my footsteps with a portable recorder and a tripod. 
 This is my final Cubase project.
 This is showing me using automation to fade in the sound on Cubase.
This is showing me adding reverb to one of my recordings on Cubase.

Wednesday, 13 April 2016

13/04/16 - soundscape practice in a group

Today we (Me, Rowan,Charlie and Ashley) went out and recorded various sound effects we would need for our soundscapes on the schools Alesis portable recorder on a tripod such as falling onto a mat to re-create Mourise falling off his horse then slamming a door to get the door slamming effects and also got the bush rustling and twig snapping sfx recorded. We will be doing the real recording in our following lessons.